Completion of First Municipal and Industrial Sludge to Electricity Plant Construction for INEVA with Collobration of Municipal and Private Sector (Under Construction)
Gaziantep Organized Industrial Zone Sewage Sludge Disposal and Energy Recovery Facilities
Capacity: 240 Ton / day
Sludge Dry Solids Content: 25%
Electricity Generation: 2500 KWh
Thermal Disposal Heat: 850-900 ° C
Facility Floor Area: 3200 m²
Completion of the Construction of the First Sludge to Electricity Plant for INEVA with Collobration of Municipal and Private Sector
Kocaeli Municipality İzmit Water Works Başiskele (Kullar)-Gebze Sewage Sludge Disposal and Energy Recovery FacilitiesPlant of Başiskele (Kullar)
Capacity: 95 Ton / day
Sludge Dry Solids Content: 22%
Electricity Generation: 960 KWh
Thermal Disposal Heat: 850-900 ° C
Facility Floor Area: 1200 m²
Capacity: 95 Ton / day
Sludge Dry Solids Content: 22%
Electricity Generation: 960 KWh
Thermal Disposal Heat: 850-900 ° C
Facility Floor Area: 1200 m²
Plant of Gebze
Capacity: 95 Ton / day
Sludge Dry Solids Content: 22%
Electricity Generation: 960 KWh
Thermal Disposal Heat: 850-900 ° C
Facility Floor Area: 1200 m²
Capacity: 95 Ton / day
Sludge Dry Solids Content: 22%
Electricity Generation: 960 KWh
Thermal Disposal Heat: 850-900 ° C
Facility Floor Area: 1200 m²
Turkey’s First Licensed Plant
Demirtaş Organized Industrial Zone Fluidized Bed Sludge Disposal and Energy Recovery Facility
Capacity: 93 Ton / day
Sludge Dry Solids Content: 25%
Steam Production: 6000 kg / h
Thermal Disposal Heat: 850 – 900 ° C
Facility Floor Area: 850 m²
Start-up of the First Plants which are able to Obtain Steam from Waste in the Private Sector
İzmir, Bandırma, Elazığ
Sludge Dry Solids Content: 20 %
Steam Production: 8000 kg / h
Thermal Disposal Heat: 850 – 900 ° C
Facility Floor Area: 500 m²